Facilities Maintenance

Roof Drain Pipe Repair & Safety Barrier

A fork truck accidentally hit the roof drain pipe, just above the floor which broke a piece of the pipe flange and bent the pipe causing it to leak. Client requested a fix to the leak and a safety barrier to prevent it from happening again.

More information >> 


Skylight Leak Repair

Repair to a leaking skylight for large drink manufacturer's headquarters using Belzona 3111 

More information >>


Cement Floor Repair

Repair and rebuilding of the plant floor due to old concrete breaking away stresses from heavy equipment.  

More information >>


Prison Steps Repair

Apply a non-slip stair nosing to the front steps of a Correctional & Treatment Facility using Belzona 4411 and Belzona 9211

More information >>


Concrete Curbing Containment

An area in a chemical containment curb/wall has become compromised over time.  CMS was retained to rebuild the damaged concrete curb   

More information >>


Concrete Runway Repair

  Repair to divots, spalls and cracks present in concrete runway 

More information >>


Shooting Range Concrete Barrier Repair

We installed a sloping layer of Belzona 4131 to a bullett trap at a Shooting Range

More information >>


Women’s Prison Shower Repair

Provide a positive grip system in new stainless steel shower stall in women's correctional facility

More information >>